Atha Energy has finished its 2026 drilling season at the Angilak uranium project in Nunavut and says the Rib North discovery now runs 3.4 km along strike, with a higher-grade sub-zone near the original discovery hole. The figures are downhole probe readings; laboratory assays are still to come.
What Atha reported
On 7 October, Vancouver-based Atha Energy (TSXV: SASK) said diamond drilling on the Mineralized Rib Corridor at Angilak was complete. Of the 23 holes drilled in the corridor this season, 21 intersected uranium mineralisation, including all seven of the final holes, RIBN-DD-017 to RIBN-DD-023.
The main change is length. By joining the Rib North and Rib East discoveries, the company says the eastern limb of the corridor now spans 3.4 km. That compares with 1.45 km in its 8 September update, which had itself extended continuity from 300 metres. On the western limb, mineralisation has been traced for about 220 metres, and Atha sees room for a much longer trend there that has not yet been drilled.
The company also outlined a sub-zone around last year's discovery hole, RIBN-DD-001, measuring about 300 metres along strike and 300 metres down dip, with several stacked mineralised structures. It describes this zone as open.
Rib North after the 2026 season
- 3.4 km eastern-limb strike length, up from 1.45 km in September
- 21 of 23 corridor holes intersected uranium mineralisation
- 19.5 m composite mineralisation in hole RIBN-DD-023
Atha Energy: share price, chart and news

The holes that stood out
RIBN-DD-023, drilled about 250 metres north-east of the discovery hole, returned 19.5 metres of composite mineralisation across fourteen zones between 180 and 777.5 metres down the hole, including 2.0 metres classed as high grade. Its best single interval was 2.5 metres averaging 6,865 counts per second (CPS) on the probe, with a peak of 26,327 CPS.
RIBN-DD-019, about 850 metres north-east of the discovery hole, was thinner but hotter: 2.5 metres of composite mineralisation over three zones, with a 1.5-metre interval averaging 17,593 CPS and peaking at 78,785 CPS. RIBN-DD-022A, at the north-eastern edge of the tested ground, returned 5.5 metres over six zones.
| Hole | Total composite | High-grade portion | Best interval |
|---|---|---|---|
| RIBN-DD-023 | 19.5 m over 14 zones | 2.0 m | 2.5 m averaging 6,865 CPS |
| RIBN-DD-019 | 2.5 m over 3 zones | 0.6 m | 1.5 m averaging 17,593 CPS |
| RIBN-DD-022A | 5.5 m over 6 zones | None reported | 1.0 m averaging 3,385 CPS |
Why the numbers need care
These are radiometric readings from a gamma probe lowered into each hole, not assay grades. Atha counts anything above 300 CPS as mineralised, a threshold it lowered from 500 CPS this year after earlier assays showed that 300 CPS usually corresponds to more than 0.01% U3O8. It treats readings above 10,000 CPS as high grade. All widths are core lengths, and true thicknesses have not been determined.
Core samples have gone to the Saskatchewan Research Council laboratory in Saskatoon, and Atha gave no date for the assays. Last year's discovery hole returned grades of up to 8.16% U3O8 over 0.5 metres; whether this season's wider intersections carry similar grades will only be known once the laboratory results arrive.
Chief executive Troy Boisjoli said Angilak "has the potential to be Canada's next uranium district". For now that is an ambition rather than a measured result: the project has no current mineral resource estimate.
Shares, funding and next steps
The shares closed at C$1.05 on 6 October, the session before the update, according to TMX Money data, down from a close of C$1.40 on 27 August.
Atha said preliminary results from further holes on the Lac 50 deposit corridor, including the Lac 50 North-West area, would follow in the coming weeks, along with the basis for its geological model of the deposit type. In August the company said 3D inversion modelling of an airborne MobileMT survey, flown from June, was expected to be completed in the autumn.
The company has no revenue. It reported cash of C$47.6 million at 30 June after financings early in the year, including a US$25 million convertible debenture with Queen's Road Capital that pays 12% a year, one third of it in shares. Further seasons at a remote Arctic project will need more money, and share-paid interest, a possible debenture conversion and new equity raises would all dilute existing holders.
Sources
- Atha Energy: Atha Energy successfully completes diamond drilling at Rib North discovery, expanding strike length to 3.4 km and identifies a higher-grade sub-zone
- Atha Energy: Atha Energy announces additional results from Rib North discovery, expanding continuity of mineralization from 300 metres to 1.45 kilometres
- Atha Energy: Management's discussion and analysis for the three and six months ended June 30, 2026
- TMX Money: Atha Energy Corp. (SASK) quote and price history








