Skip to content
Investing

Atha Energy: Investor Profile of the Uranium Explorer Behind Nunavut's Angilak Project

Atha Energy explores for uranium at Angilak in Nunavut, in Labrador and in the Athabasca Basin. Its assets, latest reported numbers, cash, share count, main risks and the dates to watch next.

Aerial view of Atha Energy's Angilak exploration camp, a row of white and green tents on brown tundra in Nunavut.
Photo: Atha Energy

Atha Energy is a uranium explorer whose main ground lies in Nunavut's Angikuni Basin, with smaller projects in Labrador and Saskatchewan and a carried stake in claims run by NexGen Energy and IsoEnergy. It has no revenue and no current mineral resource, so its value rests on drilling results and on its ability to keep paying for them.

What Atha owns and where

Atha Energy (TSXV: SASK; OTCQX: SASKF) is based in Vancouver. It describes itself as a uranium exploration company and puts its holdings at about 6.7 million acres of claims across Nunavut, Saskatchewan's Athabasca Basin and Labrador's Central Mineral Belt.

The core asset is the Angilak project, acquired in March 2024 and since enlarged by staking to 498,559 acres. It sits in the Angikuni Basin about 225 km south-west of Baker Lake in Nunavut's Kivalliq region and hosts the Lac 50 deposit. Royal Gold holds a 1% net smelter royalty on the project.

The rest of the portfolio

  • Central Mineral Belt, Labrador: 249,656 acres with two deposits carrying historical estimates of 14.5 million lb U3O8 at 0.037%, which Atha does not treat as current resources.
  • Gemini, Saskatchewan: 13 claims covering 445.3 km2 on the eastern edge of the Athabasca Basin, 27 km south-east of the McArthur River mine, home to the shallow GMZ discovery.
  • Carried interests: 10% of certain Athabasca Basin claims operated by NexGen Energy and IsoEnergy.
  • Option deals: several Athabasca properties are optioned to other explorers, which can earn interests by paying for work.

Atha Energy: share price, chart and news

Wooden core boxes 52 to 54 holding drill core from hole GEM23-061, labelled 92 Energy, which drilled it in winter 2023 before Atha acquired it; Atha's caption says the hole intersected uranium at the GMZ discovery on the Gemini project in the Athabasca Basin, Saskatchewan.
Wooden core boxes 52 to 54 holding drill core from hole GEM23-061, labelled 92 Energy, which drilled it in winter 2023 before Atha acquired it; Atha's caption says the hole intersected uranium at the GMZ discovery on the Gemini project in the Athabasca Basin, Saskatchewan. Photo: Atha Energy

Angilak: from one deposit to a corridor

Drilling in 2024 focused on the Lac 50 deposit, where Atha identified several parallel mineralised trends. The company says only about 24% of them have been drill tested. In 2025 it moved out along the 31 km Rib-Nine Iron structural corridor and reported four discoveries, including Rib North, where the first hole returned 34.7 metres of composite mineralisation with grades up to 8.16% U3O8 over 0.5 metres.

The 2026 programme, the largest yet at the project, started drilling on 1 May with three rigs. On 7 October Atha said the eastern limb of the Rib corridor had been traced for 3.4 km and that 21 of 23 holes in the corridor had intersected mineralisation. Those results are readings from a downhole gamma probe; laboratory assays are pending.

Atha has also published an exploration target for Lac 50 of 7.4 million to 9.3 million tonnes grading 0.37% to 0.48% U3O8, or 60.8 million to 98.2 million lb, at a 0.1% cut-off. The company states that the range is conceptual, that there has not been enough drilling to define a mineral resource, and that further work may never produce one.

The latest numbers

Atha's most recent filed accounts cover the six months to 30 June 2026.

Atha Energy at 30 June 2026

  • C$47.6m cash and equivalents, up from C$3.5m at the end of 2025
  • 353.5m shares outstanding at 26 August 2026
  • C$15.4m net loss for the first half, against C$4.4m a year earlier

The cash came from financings closed early in 2026 that raised about C$63 million: a US$25 million unsecured convertible debenture with Queen's Road Capital and a flow-through share placement of C$28.75 million. Working capital stood at C$44.0 million.

The second-quarter loss of C$9.7 million included a non-cash C$5.5 million fair-value loss on the debentures, which grows when the share price rises, plus C$1.0 million of debenture interest.

ItemFigure
Convertible debentureUS$25m, matures 5 February 2031
Debenture interest12% a year: 8% in cash, 4% in shares, subject to exchange approval
Flow-through spending still owedC$18.7m, to be spent by 31 December 2027
Options outstanding28.96m at 26 August 2026
Warrants outstanding18.05m at 26 August 2026
Last close, 4 November 2026C$0.79, about C$279m on the August share count

Main risks

  • No resource yet. Angilak has no current mineral resource estimate. Probe readings can differ from assays, and true widths are not yet known.
  • Financing and dilution. Atha has no revenue. Part of the debenture interest is paid in shares, the debenture can convert into stock, and options and warrants add to the potential share count. Future seasons will need new money.
  • Seasonal, remote work. Angilak is a remote Nunavut project where drilling runs in the summer months, which limits how much can be done each year.
  • Volatile shares. The stock closed at a 52-week high of C$1.40 on 27 August and at C$0.79 on 4 November, according to TMX Money. Its lowest close of the past year was C$0.56 on 17 November 2025.
  • Uranium sentiment. Like other explorers, Atha depends on investors' appetite for uranium to fund its programmes.

What to watch

WhenWhat
Coming weeks, as stated on 7 OctoberPreliminary results from further Lac 50 corridor holes, including Lac 50 North-West
Autumn 2026, as stated in August3D inversion modelling from the airborne MobileMT survey
Late November 2026Third-quarter accounts, due within 60 days of the quarter end for TSX Venture issuers
No date givenLaboratory assays for the 2026 Rib corridor core
31 December 2027Deadline to spend the remaining C$18.7m of flow-through money

The assays are the most important of these. They will show whether the grades behind this season's long probe intersections support the company's view of Angilak as a district-scale uranium system.

Sources

Related stories

Markets

Atha Energy Extends Its Rib North Uranium Find to 3.4 km as Angilak Drilling Ends

Atha Energy says 21 of 23 holes in Angilak's Rib corridor hit uranium and the eastern limb now runs 3.4 km. The results are probe readings, and assays from the Nunavut programme…

Investing

Denison Mines Investor Profile: Wheeler River, the Phoenix Build and the Road to 2028

Denison Mines is building Phoenix, a high-grade in-situ uranium mine in Saskatchewan, with first output targeted for late 2028. Its assets, latest numbers, funding, risks and the…

Investing

NexGen Energy Investor Profile: Building Rook I, a Large High-Grade Uranium Mine

NexGen Energy is building Rook I around the Arrow uranium deposit in Saskatchewan. What it owns, the expected cost of the mine, its latest numbers, the funding gap, the risks and…

Investing

Boss Energy Profile: Honeymoon, Alta Mesa and a Year of Transition for the Uranium Producer

Boss Energy mines uranium at Honeymoon in South Australia and owns 30% of Alta Mesa in Texas. It has no debt and a large stockpile, but output falls this year as it changes mining…

Investing

Aya Gold & Silver Corrects Q3 Cash Costs to $14.28 an Ounce After Silver Double Count

Aya Gold & Silver refiled its Q3 MD&A after silver in transit was deducted twice. Zgounder ounces sold rise to 1,392,478 and cash costs fall to $14.28 from $15.51. Revenue and…

Investing

FDA Rejects Summit's Lung Cancer Drug Ivonescimab Over Phase 3 Survival Miss

The FDA has rejected Summit Therapeutics' lung cancer drug ivonescimab, saying slower tumour growth in the phase 3 HARMONi trial was not enough without a clear gain in survival.

Investing

Red Cat Withdraws Its $150m to $180m 2026 Revenue Target After $11.8m Third Quarter

Red Cat Holdings has withdrawn its $150m to $180m revenue target for 2026 after third-quarter sales of $11.8m, blaming slower defence funding. Its quarterly net loss more than…

Investing

Berkshire Reveals $689m Bending Spoons Stake, Doubles Lennar and Trims Bank of America Again

Berkshire Hathaway's third-quarter 13F shows a new Bending Spoons stake worth $689m, a doubled Lennar holding and 27.5 million more Bank of America shares sold, while Apple stayed…