Peninsula Energy owns one of the larger independent uranium projects in the United States and has spent the past year trying to make it work. Lance, in Wyoming, restarted in 2025 using a new acid-based process, but output has been a fraction of plan. The company lost US$77.1m in its last financial year, its accounts flag a material uncertainty about its future as a going concern, and 2027 is the year it has to prove the operation can pay its way.
What Peninsula Owns
Peninsula is listed on the ASX as PEN and trades in the US on the OTCQB as PENMF. Its operating business is run through a wholly owned US subsidiary, Strata Energy.
The core asset is the wholly owned Lance Project in Wyoming. Lance is an in-situ recovery (ISR) operation: wells pump a leach solution through underground sandstone to dissolve uranium, and a central processing plant recovers it on resin, then dries and drums it as yellowcake. Peninsula has switched Lance from the alkaline chemistry used in its earlier operations to a low-pH, acid-based method, similar to the one used at several South Australian mines, which it says gives much higher uranium grades in solution.
Lance holds a mineral resource of 59.0 million pounds of U3O8 (53.9 million tonnes at 0.050%), updated in September 2026. Of that, 4.3 million pounds are measured, 12.9 million indicated and 41.7 million inferred. Peninsula also has the Dagger project in Wyoming, with an inferred resource of 6.9 million pounds at 0.104%. Its old Karoo permits in South Africa have expired or are in closure.
Peninsula Energy: share price, chart and news

A Difficult Ramp-Up
Production restarted in September 2025, but the wellfields have not delivered the flow of solution the plan assumed. Gas build-up, wellfield design problems in older mine units and chemistry that took time to tune all slowed the ramp-up. In July 2026 Peninsula withdrew its 2026 guidance of 400,000 to 500,000 pounds and decided to concentrate on Mine Unit 4 and future units.
In the year to June 2026, Lance captured 25,331 pounds on resin. In the September quarter it captured 17,968 pounds. The company says flow rates have since recovered in most Mine Unit 4 header houses and that the focus is now on raising uranium grades by adding more acid. It has reconfirmed guidance of 500,000 to 600,000 pounds for calendar 2027.
To strengthen the operation, Peninsula hired Gary Birch, formerly chief operations officer of Heathgate Resources, as chief technical officer, set up a board technical committee chaired by director Keith Bowes, and engaged the ISR consultancy Rendement. It is also moving wellfield drilling to its own rigs to cut costs.
The Numbers
| Year to 30 June | 2026 | 2025 |
|---|---|---|
| Loss after tax | US$77.1m | US$12.5m |
| Uranium sales | 10,066 lb for US$0.6m | nil |
| Cash used in operations | US$39.0m | US$8.8m |
| Spent on Lance development | US$26.6m | US$81.9m |
| Cash at year end | US$22.1m | US$9.2m |
The 2026 loss includes a US$50.1m non-cash impairment, mainly on older wellfields in Mine Units 1 to 3, and a US$23.3m write-down of uranium inventory, because low output made each pound expensive to produce.
Peninsula has relied on repeated fundraising. In the September 2025 quarter it raised A$69.9m in equity at A$0.30 a share. In May 2026 it announced a US$56m package: an A$21.8m placement and an A$14.2m entitlement offer at A$0.35, plus a US$30m convertible note facility from Washington H. Soul Pattinson, which was drawn in July. Soul Pattinson also received 10,786,125 warrants exercisable at A$0.525. An earlier US$15.0m Davidson Kempner convertible loan was fully converted into 76,288,909 shares during the year.
Latest position
- US$33.6m cash at 30 September 2026
- 571.6m ordinary shares on issue in November 2026
- 59.0 Mlb U3O8 resource at Lance
In the September quarter operations used a net US$11.5m and development another US$6.5m, while customer receipts were US$0.65m. On the ASX's standard calculation, the September cash covers about 2.9 quarters of outflows. Peninsula expects sales from Lance production to begin in the coming months, which would reduce the gap. Beyond spot sales, it has one long-term contract to deliver 100,000 pounds a year from 2028 to 2033, which it can end on or before 31 December 2027 by paying a termination fee.
The Risks
What could go wrong
- Going concern: the annual report says there is material uncertainty about the company's ability to continue, because production is below the rate needed to cover costs
- Funding and dilution: further equity or convertible debt is likely if the ramp-up stays slow; warrants, options and the convertible note add to potential dilution
- Operations: head grades have not yet responded fully, and some wellfields have repeatedly fallen short of targets
- Costs: acid prices are high enough that low-grade wells in Mine Unit 1 were shut
- Collateral: the surety bond provider has asked for more cash collateral
- Price: revenue will depend on uranium prices, which can be volatile
What to Watch
| When | What |
|---|---|
| 23 November 2026 | Annual general meeting in Perth |
| December quarter 2026 | Planned return of the flotation unit, which limits HH17's flow, to 1,000 GPM capacity |
| Coming months | First sales of uranium produced at Lance, according to the company |
| December quarter 2026 report | Whether higher acid addition lifts head grades |
| By 31 December 2027 | Deadline for any early termination of the sales contract |
| Calendar 2027 | Guidance of 500,000 to 600,000 pounds of U3O8 |
Peninsula has a large resource, a built plant and a lender in Washington H. Soul Pattinson. What it has not yet shown is steady production at a commercial rate. Until it does, quarterly production figures and the way it funds the shortfall are the main things to follow.
Sources
- Peninsula Energy: Annual Report for the Year Ended 30 June 2026
- Peninsula Energy: September 2026 Quarterly Activities Report
- Peninsula Energy: Quarterly Cashflow Report, September 2026
- Peninsula Energy: Notification regarding unquoted securities, 3 November 2026
- Peninsula Energy: Shareholder Letter, 2026 Annual General Meeting