Thesis Gold & Silver is developing Lawyers-Ranch, a gold-silver project in northern British Columbia with a prefeasibility study, two large gold miners on its share register and C$121.7 million in cash. It has no revenue, and its next tests are a feasibility study and a provincial environmental review.
What Thesis owns and where
Thesis Gold & Silver (TSXV: TAU; OTCQX: THSGF) is based in Vancouver. It changed its name from Thesis Gold in February 2026. Its single focus is the wholly owned Lawyers-Ranch project in the Toodoggone mining district of north-central British Columbia. Lawyers lies about 45 km north-west of the Kemess gold-copper mine, and the Sturdee airstrip sits just south of it.
The project combines two areas, Lawyers and Ranch, and the company also holds Ranch East, a 5,630-hectare block east of Ranch. In 2026 it began testing the idea that the district's epithermal gold-silver deposits sit above deeper porphyry systems, and says this season's mapping points to two porphyry targets.
Thesis Gold & Silver: share price, chart and news

The prefeasibility study
The study, published on 1 December 2025 and filed as a technical report in January 2026, outlines a mostly open-pit operation with some early underground mining at Lawyers.
| Measure | Prefeasibility study, December 2025 |
|---|---|
| After-tax NPV at 5% | C$2.37 billion |
| After-tax IRR / payback | 54.4% / 1.1 years |
| Initial capital | C$736.2 million |
| Sustaining capital | C$789.4 million, excluding closure |
| All-in sustaining cost | US$1,185 per gold-equivalent ounce |
| Output, first five years | 237,000 gold-equivalent oz a year (185,000 oz gold, 4.29m oz silver) |
| Output, life of mine | 187,000 gold-equivalent oz a year |
| Mine life | 15 years after two years of pre-production |
| Reserves | 76.16 Mt at 0.97 g/t gold and 28.08 g/t silver |
| Price assumptions | US$2,900/oz gold, US$35/oz silver |
The study is a prefeasibility-level estimate, and costs and output could change at feasibility stage.
The 2026 field season and permitting
The 2026 programme was designed around 20,000 metres of drilling. By 14 October Thesis had drilled 6,500 of a planned 8,000 metres of geotechnical and water-related holes for the feasibility study, and 7,500 of a planned 12,000 metres of exploration drilling, about half of it at the Steve zone, where a 2025 hole returned 38.00 metres at 3.62 g/t gold. Crews also dug 121 test pits, mapped 3,600 hectares at Ranch East, ran 26.6 line-km of induced polarisation surveys and collected 714 surface samples that are still being analysed.
On permitting, Ottawa agreed in June that British Columbia's Environmental Assessment Office will run a single review that stands in for the federal process. Thesis submitted its Detailed Project Description on 25 September, and the office accepted it the same day, moving the assessment into its Readiness Decision phase.
The latest numbers
Thesis is moving its year end from February to December, so it will report a ten-month financial year ending 31 December 2026. Its latest accounts cover the six months to 31 August.
Thesis Gold & Silver at 31 August 2026
- C$121.7m cash, up from C$76.1m at 28 February
- 294.9m shares outstanding at 14 October 2026
- C$9.1m net loss for the six months, against C$2.6m a year earlier
Working capital was C$104.9 million. Cash rose after the C$58.5 million placement closed on 27 August, which lifted AngloGold Ashanti's holding to 9.7%. Part of that money came from charity flow-through shares and must be spent on eligible exploration at Lawyers-Ranch by the end of 2027. The second-quarter loss rose to C$5.8 million, mainly because professional fees climbed to C$2.3 million on capital markets advisory work.
According to the company's investor page, Centerra Gold holds 9.4%, and the Tsay Keh Dene, Takla and Kwadacha First Nations are equity investors. The investor page also flags Equinox Partners as holding more than 10% of the voting rights. At the MD&A date there were 10.2 million options and about 3.5 million share units outstanding. The company lists eight brokers whose analysts cover the stock, including CIBC, National Bank, Scotiabank and TD Cowen.
Main risks
- Financing and dilution. Thesis has no revenue. Building a mine with an initial capital cost of C$736 million would need far more than its cash, through equity, debt or partners.
- Permitting and community agreements. The environmental review has not yet reached a Readiness Decision, and the company gave no timetable for permits.
- Study risk. Prefeasibility estimates can move materially at feasibility stage.
- Metal prices. Project value is sensitive to gold and silver prices.
- Share price. The stock closed at C$2.45 on 6 November, according to TMX Money, about a third below the C$3.68 close on 27 August and 38% below its closing high of C$3.94 on 14 May. That values the company at about C$722 million.
What to watch
| When | What |
|---|---|
| 18 to 19 November 2026 | Swiss Mining Institute conference in Zurich, listed on the company's events page |
| 30 November and 31 December 2026 | Deadlines to renounce flow-through expenditures to subscribers |
| 1 to 2 December 2026 | Scotiabank Mining Conference in Toronto |
| 31 December 2026 | End of the ten-month transition financial year |
| No date given | EAO Readiness Decision on Lawyers-Ranch |
| No date given | Feasibility study, and results from the 2026 drilling and Ranch East sampling |
Sources
- Thesis Gold & Silver: Management's discussion and analysis for the three and six months ended August 31, 2026
- Thesis Gold: Thesis Gold announces positive prefeasibility study for Lawyers-Ranch project: after-tax NPV5% of $2.37 billion and 54.4% IRR
- Thesis Gold & Silver: Thesis Gold & Silver submits Detailed Project Description for its Lawyers-Ranch gold-silver project
- Thesis Gold & Silver: Thesis Gold & Silver closes C$58.5M offering supported by strategic investment from AngloGold Ashanti
- Thesis Gold & Silver: Investors: shareholder information and events
- TMX Money: Thesis Gold & Silver Inc. (TAU) quote and price history