Aya Gold & Silver produced a record 2.03 million silver-equivalent ounces in the third quarter of 2026, lifted revenue 90% to $103.3 million and cut consolidated cash costs by a quarter from a year earlier, according to results published on 12 November.
A record quarter from two sources
The Canadian miner, which operates in Morocco and reports in US dollars, produced 2,034,628 ounces of silver equivalent (AgEq) in the three months to 30 September. That was 51% more than a year earlier and 21% more than in the second quarter.
Most of the metal came from Zgounder, the company's silver mine in the Anti-Atlas mountains, which produced 1,497,749 ounces of silver, up 11% year on year. The remaining 536,879 AgEq ounces came from reclaiming an old pyrite stockpile at Boumadine, Aya's gold-silver development project in Errachidia province. The material reclaimed contained about 4,300 ounces of gold and 244,875 ounces of silver in the quarter.
Zgounder's mill processed 376,863 tonnes, or 4,096 tonnes a day, 23% more than a year earlier. Processed grade was 146 grams of silver per tonne and combined recovery was 92.0%, up from 91.2% in the second quarter.
Aya Gold & Silver: share price, chart and news

Revenue, profit and cash
Q3 2026 at a glance
- $103.3m revenue, up 90% year on year
- $35.0m net income, up 182%
- $183.8m cash and equivalents at 30 September
Revenue split into $86.2 million from silver and $17.1 million from pyrite sold out of the Boumadine reclaim. Operating income rose 292% to $59.5 million. Net income reached $35.0 million, of which $33.5 million was attributable to shareholders, equal to $0.23 a basic share and $0.22 diluted.
Operating cash flow was $48.1 million, up 115% on a year earlier. Over nine months, revenue came to $317.4 million and operating cash flow to $166.7 million.
Aya ended September with $183.8 million in cash and equivalents, $16 million of restricted cash and working capital of $153.7 million. Non-current financial liabilities stood at $43.6 million, down from $84.6 million a year earlier.
Higher prices also helped: the consolidated realised price was 49% above a year earlier. Zgounder silver sold for an average $69.32 an ounce in the quarter. The consolidated realised price was $59.50 per AgEq ounce, pulled down by the Boumadine reclaim material, which realised $34.72.
Costs move lower
Consolidated cash costs fell to $15.51 per AgEq ounce sold, 25% below a year earlier and 8% below the second quarter. At Zgounder, the cash cost was $17.53 per ounce of silver sold, down 16% year on year. The Boumadine reclaim ran at $10.42 per AgEq ounce. The release reports cash costs only, not all-in sustaining costs.
Sales lagged production at Zgounder: 1,243,092 ounces of silver were sold, 9% fewer than a year earlier. Consolidated AgEq sales rose 27% to 1,736,024 ounces.
President and chief executive Benoit La Salle said "Q3 was another record quarter for Aya", pointing to lower cash costs and stronger cash flow from the company's optimisation work.
Guidance and what to watch
Aya now expects 6.6 to 6.8 million AgEq ounces for 2026, including about 1.0 million from the Boumadine reclaim. Zgounder guidance is 5.6 to 5.8 million ounces of silver, with the low end raised from 5.2 million. Full-year Zgounder cash costs are expected below $21.50 an ounce, on assumptions of $50 silver and $4,000 gold.
Points to watch
- Open-pit pushbacks at Zgounder, planned from late 2026 through 2027
- The Boumadine feasibility study, targeted for the second half of 2027
- A definitive agreement to sell the Azegour project to Sama Resources for about 19.11% of Sama
- The dispute with Duro Felguera over the Zgounder plant contracts, before a Spanish appeal court and ICC arbitration
Several parts of the quarter are temporary or uncertain. The Boumadine reclaim is expected to run for about 20 to 24 months from November 2025, or until the stockpile is used up. Boumadine itself is not yet built: the updated preliminary economic assessment released in September puts initial capital at $463 million and relies partly on inferred resources, which are less certain than reserves. Aya's production and assets are concentrated in one country, Morocco, and its results move closely with the silver price.
Infill drilling at Boumadine reached 181,685 metres by 31 October, past the 180,000-metre target. Exploration spending was $18 million in the quarter, and the company says its Moroccan land package has grown by about 50% to more than 1,200 square kilometres.