Graphite One is a Vancouver-based development company that wants to build a United States supply chain for battery anode material, from a graphite deposit in Alaska to a plant in Ohio. It has no revenue yet, US$20.1 million in cash at the end of September and a going-concern warning in its own filings. This profile sets out what it owns, its latest numbers and the dates that matter.
What the company does
Graphite One's plan has two linked parts. In Alaska it is permitting the Graphite Creek deposit on the Seward Peninsula, about 55 km north of Nome. The US Geological Survey describes it as the largest known graphite deposit in the country. In Ohio it plans a plant in Conneaut that would turn graphite into active anode material, the powder that forms the negative electrode of lithium-ion batteries in electric vehicles and energy storage systems.
The company reports in US dollars and trades on the TSX Venture Exchange under GPH and over the counter in the US as GPHOF. It has generated no operating revenue to date.
Graphite One: share price, chart and news

The latest numbers
The third-quarter filings, approved on 12 November, show a company spending more as it moves toward construction.
| Item | Q3 2026 filings |
|---|---|
| Net loss, Q3 | $3.2 million (Q3 2025: $2.3 million) |
| Net loss, nine months | $9.7 million (2025: $5.8 million) |
| Cash at 30 September | $20.1 million (31 Dec 2025: $8.4 million) |
| Working capital | $17.7 million |
| Cash used in operations, nine months | $10.7 million |
| Accumulated deficit | $73.5 million |
Cash rose because of a February 2026 public offering that raised C$35.0 million gross, about $23.7 million net, plus C$8.6 million from warrant exercises. The company says the rest of the offering money should be used by the second quarter of 2027.
The higher loss came mainly from online marketing to European and US investors, which cost $2.3 million more in the nine months than a year earlier, and from development costs for the Ohio plant. In October the company signed an agreement with Frontier Media for marketing services at $250,000 a month for six months.
Share structure at 12 November 2026
- 209.7m common shares outstanding
- 276.8m shares fully diluted
- 41.8m warrants, average exercise price C$1.62
The fully diluted count adds options, restricted and performance share units and warrants. At C$0.67, the 12 November close, the warrants sit well above the share price.
Graphite Creek, Alaska
A feasibility study filed in April 2025 models a 20-year mine feeding a secondary treatment plant that would make 256,000 tonnes a year of graphite products at full capacity. The company's project page gives an after-tax net present value of $5 billion at an 8% discount rate and a 27% internal rate of return. Those figures come from a study with long-dated price and cost assumptions and are not a forecast of returns.
Federal permitting moved from an environmental assessment to a full environmental impact statement in September 2026. The FAST-41 federal dashboard now shows the US Army Corps of Engineers completing that process in September 2027. The company's 2 November release targets mine construction in 2028 and production in 2030; its July statement on the switch to an impact statement referred to a 2029 start, so the timetable is worth checking in each update.
On 10 November Graphite One started a three-month program with Ames National Laboratory to test whether rare earths, including dysprosium, yttrium and scandium, can be recovered from garnet in the deposit. The company says there is no certainty they can be extracted economically. In October it also won a Defense Logistics Agency award, of undisclosed value, to test carbon materials from the deposit for high-temperature defence uses.
Ohio Phase 1
The first step is a 10,000-tonne-a-year finishing and blending plant in Conneaut that would use purchased material, so it could sell product before the mine exists. The estimated initial cost is US$80 million, to be updated after engineering. The Ohio EPA issued the final air permit on 27 October; other state and local permits are still needed.
Chief executive Anthony Huston said: "Ohio lets us pursue customer sales, generating company revenue, before mine production begins."
The company holds non-binding letters of interest from the Export-Import Bank of the United States totalling US$2.07 billion and non-binding supply agreements with Lucid Motors. None of these is a firm commitment.
Main risks
What could go wrong
- Going concern: the filings say more financing is needed within twelve months and that there is material uncertainty
- Dilution: equity raises and 67 million potential shares from options, units and warrants
- Financing: the US$80 million plant and the far larger mine have no committed funding
- Permits: the Alaska mine is in a full federal impact statement process with state permits to follow
- Customers: product qualification and binding offtake are not yet in place
- Policy: the case relies on US supply-chain policy and China's export controls, both of which can change
The shares have fallen from C$1.01 on 3 September to C$0.67 on 12 November.
What to watch
| Date | Event |
|---|---|
| Early 2027 | End of the three-month Ames rare earth program begun on 10 November |
| By April 2027 | Target for Ohio final investment decision, construction contract and start of works |
| By Q2 2027 | Company expects to have used the February 2026 offering proceeds |
| September 2027 | Scheduled federal impact statement and Army Corps decision on Graphite Creek |
| Q4 2028 | Target for first sales from Ohio Phase 1 |
Sources
- Management's Discussion and Analysis, three and nine months ended 30 September 2026 (Graphite One, 12 November 2026)
- Investors: share structure (Graphite One, as of 12 November 2026)
- Graphite One Outlines Path to Production for Ohio Manufacturing Plant Following Air Permit (Graphite One, 9 November 2026)
- Graphite One Secures Final Ohio Air Permit (Graphite One, 2 November 2026)
- Graphite One Engages Ames National Laboratory to Assess Rare Earth Recoveries (Graphite One, 10 November 2026)
- Graphite One Awarded Defense Logistics Agency Program (Graphite One, 26 October 2026)
- Graphite Creek project page (Graphite One)
- Graphite One Inc. (TSXV: GPH) stock price history (StockAnalysis)