Skip to content
Investing

Los Andes Copper: Investor Profile of the Vizcachitas Copper Project in Chile

Los Andes Copper owns Vizcachitas, one of South America's largest undeveloped copper projects, 120 km north of Santiago. Its study numbers, cash, share count, court cases, risks and what to watch.

The Vizcachitas project valley in the Chilean Andes, looking north along a river and dirt road
Photo: Los Andes Copper

Los Andes Copper is a Vancouver-based company with one main asset: the Vizcachitas copper-molybdenum-silver project in central Chile, which it owns outright. A 2023 pre-feasibility study describes a large open-pit mine, but the company has no revenue, an interim chief executive and court cases still running. This profile sets out the project, the latest numbers and the main risks.

What Los Andes does and where

The shares are listed on the TSX Venture Exchange under LA and trade in the US over the counter as LSANF. Vizcachitas sits in the Andes in San Felipe province, Valparaiso region, about 120 km north of Santiago and 46 km northeast of the town of Putaendo, at about 1,950 m above sea level. It lies in the same mineral belt as large porphyry mines such as Los Pelambres and Rio Blanco.

At 30 June 2026 the company held 52 exploitation concessions over 10,771 hectares and 174 exploration claims covering 47,440 hectares. It also owns non-consumptive water rights on the Rocin river with studies for a 28 to 30 MW run-of-river hydro plant.

In January 2026 chief executive Santiago Montt resigned after being appointed Minister of Mines in the incoming government of President José Antonio Kast. Chief geologist Antony Amberg became interim chief executive, and the board has been searching for a permanent replacement.

Los Andes Copper: share price, chart and news

Panoramic view of the Vizcachitas project area looking east.
Panoramic view of the Vizcachitas project area looking east. Photo: Los Andes Copper

The Vizcachitas project

The pre-feasibility study (PFS), announced in February 2023, plans a conventional open pit feeding a 136,000-tonne-a-day concentrator over a 26-year life. It would produce a copper concentrate carrying silver and a separate molybdenum concentrate. Copper would provide 88% of net revenue and molybdenum 10%.

The design uses desalinated seawater from a third-party consortium, with which the company has signed a letter of intent, and filtered, dry-stacked tailings. The company says this roughly halves water use compared with conventional thickened tailings. Power would come through a 60 km line to the national grid, and concentrate would travel 145 km by truck to the port of Ventanas.

Crushing would use high-pressure grinding rolls, which the company says cut power use by about 25% compared with the mill design in its 2019 preliminary economic assessment. Beyond the initial US$2.44 billion, the study adds about US$1.5 billion of deferred and sustaining capital over the mine's life. All-in sustaining costs are put at US$2.13 a pound for the first eight years and US$2.35 over the life of the mine.

Vizcachitas PFS (2023)Figure
Proven and probable reserves1.22bn t at 0.41% copper equivalent
Measured and indicated resources1,541 Mt at 0.436% copper equivalent
Inferred resources1,823 Mt at 0.384% copper equivalent
Copper output183,017 t a year for 8 years; 152,883 t life of mine
Initial capital costUS$2.44bn
Post-tax NPV (8%) and IRRUS$2.8bn and 24% at US$3.68/lb copper
C1 cash costUS$0.93/lb first 8 years; US$1.25/lb life of mine

The company's website also shows a post-tax value of US$5.48 billion and an IRR of 37% at US$5.00 a pound copper. Those figures rest on study prices set in 2023, and costs have moved since.

Latest numbers

The company's financial year ends on 30 September. The latest published accounts cover the nine months to 30 June 2026, reported in Canadian dollars.

At 30 June 2026

  • C$17.6m cash, down from C$22.8m at 30 September 2025
  • C$5.4m net loss for the nine months
  • 30.4m shares outstanding at 20 August 2026

Working capital was C$11.6 million. The company capitalised C$4.1 million of exploration spending in the nine months. The loss included a C$2.0 million loss on the derivative tied to its convertible debentures, which moves with the share price. In the June quarter alone it reported net income of C$1.0 million, helped by non-cash gains.

The balance sheet has been shaped by royalty sales and convertible debt rather than large share issues. Royalty holders include Ecora Resources, which paid US$20 million in 2023, Franco-Nevada, Metalla and RCF. In April 2026 Los Andes converted a US$5 million debenture into 638,573 shares. Two convertible debentures held by Queen's Road Capital, of US$4 million and US$5 million, remain outstanding. They pay 8% a year, three percentage points of it in shares. On 1 September the company elected to settle US$67,495 of that interest with 7,281 shares at a deemed price of C$12.92 each.

Main risks

Financing. The company states plainly that it needs more money to begin feasibility work and could have to curtail development without it. Building the mine would cost about US$2.44 billion up front, many times the company's C$17.6 million of cash.

Courts and community. In October 2025 Chile's Environmental Court rejected claims by the Municipality of Putaendo and others against the company's drilling permit. The municipality appealed, and the case was before the Supreme Court as of August 2026, with a ruling expected during 2026. A separate 2022 lawsuit by 24 individuals alleges environmental damage from drilling done between 2007 and 2017, which the company calls unfounded.

Royalty step-ups. The Ecora royalty rate rises in up to three steps if production is delayed beyond 30 June 2030. Los Andes can avoid the second and third increases only by paying US$15 million, or US$20 million if copper is above US$5 a pound, each time.

Leadership and study age. The company has an interim chief executive, and the PFS dates from 2023.

What to watch next

Milestones

  • Supreme Court ruling on the drilling-permit appeal, expected by the company during 2026
  • Appointment of a permanent chief executive
  • Audited annual results for the year to 30 September 2026, which Canadian rules for venture issuers require within 120 days of the year end
  • Next quarterly interest settlement on the Queen's Road debentures, which have been dated March, June and September this year
  • Any financing to start feasibility work at Vizcachitas

Sources

Related stories

Investing

Hot Chili: Investor Profile of the Costa Fuego Copper Developer and Its La Verde Discovery

Hot Chili is developing the Costa Fuego copper-gold project in Chile's coastal Atacama and drilling a fast-growing discovery at La Verde. Its assets, latest numbers, cash, risks…

Investing

Ero Copper: Investor Profile of the Brazil-Focused Copper and Gold Producer

Ero Copper mines copper at Caraíba and Tucumã and gold at Xavantina, all in Brazil. Its assets, record Q3 2026 numbers, debt, share count, main risks and the milestones to watch.

Investing

Ivanhoe Electric: The Arizona Copper Developer Behind the Santa Cruz Project

Ivanhoe Electric is moving its Santa Cruz copper project in Arizona towards construction, with $215m of cash against a $1.43bn upfront cost. Its assets, numbers, risks and the…

Investing

NGEx Minerals Investor Profile: Lunahuasi, the Cash Pile and the Valiente Spin-Out

NGEx Minerals is drilling Lunahuasi, a high-grade copper-gold-silver discovery in Argentina. A guide to its C$202m of cash and short-term investments, the Valiente spin-out and the…

Investing

Aya Gold & Silver Corrects Q3 Cash Costs to $14.28 an Ounce After Silver Double Count

Aya Gold & Silver refiled its Q3 MD&A after silver in transit was deducted twice. Zgounder ounces sold rise to 1,392,478 and cash costs fall to $14.28 from $15.51. Revenue and…

Investing

FDA Rejects Summit's Lung Cancer Drug Ivonescimab Over Phase 3 Survival Miss

The FDA has rejected Summit Therapeutics' lung cancer drug ivonescimab, saying slower tumour growth in the phase 3 HARMONi trial was not enough without a clear gain in survival.

Investing

Red Cat Withdraws Its $150m to $180m 2026 Revenue Target After $11.8m Third Quarter

Red Cat Holdings has withdrawn its $150m to $180m revenue target for 2026 after third-quarter sales of $11.8m, blaming slower defence funding. Its quarterly net loss more than…

Investing

Berkshire Reveals $689m Bending Spoons Stake, Doubles Lennar and Trims Bank of America Again

Berkshire Hathaway's third-quarter 13F shows a new Bending Spoons stake worth $689m, a doubled Lennar holding and 27.5 million more Bank of America shares sold, while Apple stayed…